Residential — Alterations & Additions
9 Sample Street, Caulfield South VIC
Pricing Modifiers, Systems & Escalation Index
Builder's Margin
Applied as a direct commercial multiplier across trade subtotal before GST. Represents overhead, supervision, site administration, and target profit.
Design & Construction Contingency
Allowance for unknown site conditions, documentation gaps, and unforeseen variations during execution.
Trade Sub-total
$1,182,317
Margin 15%
$177,348
Contingency 7%
$82,762
Total Ex-GST
$1,442,427
Total Inc-GST
$1,586,670
Rate $/m²
$6,442
Sub-total
$1,182,317
Margin 15.0%
$177,348
Contingency 7.0%
$82,762
Total ex GST
$1,442,427
Inc GST
$1,586,670
Cost per m²
$6,442
6 conditions changed this estimate
Two or more storeys require a full perimeter scaffold
At two storeys and above the work platform exceeds 4m, which mandates a licensed scaffold with a working deck per level rather than trestles. Scaffold face area is perimeter × wall height × storeys, so a double-storey job carries roughly double the scaffold area of a single-storey job of the same footprint, plus a longer hire period.
Two or more storeys require suspended floor structure and a stair
Suspended floor framing, floor insulation and a stair only exist above one storey. Two-storey construction adds 15–20% to the base rate per m², covering these plus the additional steel and more complex structural engineering.
Precast, portal frame and truss erection require a crane
Panel and portal erection cannot proceed without lifting plant.
Renovation requires protection of retained structure and finishes
Work adjacent to occupied or retained fabric carries protection, propping and make-good costs that do not exist on a greenfield build. Make-good is the line item most often missed in renovation estimates.
Pre-1990 buildings require a hazardous materials survey
Asbestos and lead paint must be identified before demolition on any building that predates 1990. The survey is priced; removal is normally excluded and carried as a provisional sum because the extent is unknowable until the survey is done.
Lightweight wall systems allow a reduced footing design
A wall system under half the dead load of brick veneer can permit a lighter slab and footing design on reactive clay. On Melbourne Class H sites this saving frequently exceeds the panel premium — worth checking against the structural engineer before assuming the brick footing design.
Bill of Quantities
181 lines · 24 trades · vic-metro/2026-Q3
166 lines (92% of trade cost) are priced from unverified rates.
Review those rates before this estimate is issued to anyone outside the practice.
| Description | Qty | Unit | Rate | Total |
|---|---|---|---|---|
| Scaffolding — Erect, Dismantle & Certify | 238 | m2 | $35 | $8,316 |
| Crane Hire — Truss & Steel Erection | 2 | ea | $3,200 | $6,400 |
| Scaffolding Hire — Ongoing | 15 | wks | $350 | $5,268 |
| Site Fencing | 1 | item | $1,200 | $1,200 |
| Signage | 1 | item | $1,000 | $1,000 |
| Skip Bins | 35 | ea | $880 | $30,786 |
| Toilet hire | 35 | wks | $135 | $4,725 |
| Extinguisher | 1 | item | $300 | $300 |
| First Aid | 1 | item | $300 | $300 |
| Temporary Power | 1 | item | $1,200 | $1,200 |
| Construction Insurance | 6 | month | $1,350 | $8,100 |
| Management Software | 6 | month | $500 | $3,000 |
| Petty Cash | 1 | item | $5,000 | $5,000 |
| Protective Equipment | 1 | item | $1,000 | $1,000 |
| Surveyors Set-Out | 2 | item | $3,500 | $7,000 |
| Final Clean | 1 | item | $3,500 | $3,500 |
| Window Cleaning (internal + external) | 1 | item | $1,200 | $1,200 |
| WHS Plan, SWMS & Site Induction | 1 | item | $1,450 | $1,450 |
| Site Container, Tool Shed & Office | 1 | item | $4,500 | $4,500 |
| Temporary Water & Backflow Prevention | 1 | item | $950 | $950 |
| Crossover & Kerb Protection | 1 | item | $1,800 | $1,800 |
| Site Access Road — Crushed Rock | 1 | item | $4,800 | $4,800 |
| Domestic Building Insurance (Home Warranty) | 224 | m2 | $1 | $224 |
| Building Surveyor Inspections | 1 | item | $2,800 | $2,800 |
| Handover Documentation & Certificates | 1 | item | $1,650 | $1,650 |
| Protection — Films, Goop & Floor Protection | 224 | m2 | $12 | $2,687 |
| Temporary Stair Protection | 1 | item | $450 | $450 |
- Sub-total
- $1,182,317
- Builder's margin @ 15%
- $177,348
- Contingency @ 7%
- $82,762
- Total ex GST
- $1,442,427
- Inc GST
- $1,586,670